Timeline

The public project record: foundation first, then a sharper boundary around operator authority.

The public repository is intentionally small, but its history records a clear change in emphasis: from a workbench foundation to an interface that treats operator authority as a technical requirement.

Public milestones

Date Public milestone Why it matters
July 3, 2026 Public workbench foundation and README established. The project stated that lifecycle discipline—not a scan command—is the product.
July 4, 2026 Inventory priority-review workflow added. Review moved from a generic handoff toward an operator-facing working surface.
July 5, 2026 Priority-review authority boundary documented. The project made explicit that a model may organize discovered terrain but must not hide it.
Current documentation pass Markdown-native manual and Pages presentation layer added. The public story, architecture, evidence boundary, and supporting reference now live beside the code.

What comes next

Future public work is intentionally framed as planned rather than complete: more deterministic synthetic demonstrations, public-safe visual material, clearer local configuration examples, normalized report artifacts, and stronger release-audit tooling. Each item requires its own public-content review before it becomes part of the portfolio record.